|
|
|
U.S. & Canada
Patent #5,152,244 - #5,458,080
#5,927,433 - #5,970,905 - #6,021,733
Below we present videos of an actual boat step
installation.
|
|
STEP
#1
|
|
|
Insert
the 2 front tube extensions inside the channel brackets
and insert counter sunk bolt through channel bracket and
tube to hold in place.
DO NOT
attach lock nuts yet (this will ease installation of third
tube)
|
|
|
Next,
position step to the very front of your platform.
Location is very
important, it must be all the way to the front of the platform. |
|
|
Trace
the 2 channel brackets giving yourself a guideline where
to position. Next, remove bolt and place channel brackets
over outline. |
|
|
Mark
your holes and drill. Line up channel brackets over holes
drilled. |
|
STEP
#2
|
|
|
Add
marine silicone to threads of hardware specified for your
particular application and tighten.
|
|
|
Once
more, line up the 2 front tube extensions inside the channel
brackets and insert the bolt through bracket
and tube to hold in place. |
|
|
DO
NOT attach lock nuts yet. With the 2 front tubes in place
-
insert bolt throught 3rd channel braket and
tube but, again do not attach lock nuts. Locate
the position of the 3rd channel braket by RETRACTING your
step ALL THE WAY UP, PARALLEL to the platform surface.
Trace the channel bracket by giving yourself a guideline
where to position.
|
|
|
Next,
remove bolt and place channel bracket over outline - mark
your holes and drill.
|
|
|
Place
the channel bracket into position again, insert hardware
and add marine silicone to threads and tighten
|
|
|
Once
more place third tube in channel bracket insert bolt and tighten with lock nut. |
|
|
Now,
go back and attach the outer 2 lock nuts on your front brackets
and tighten. |
|
|
You're
all done! |
Do
you have technical questions?
|
|
|